Corrective Measures Study Workplan Now Available [1]

Posted by : BillA on May 15, 2008 - 12:38 PM
environmentaltopics [2]
The Corrective Measures Study (CMS) work plan for the Air Deposition Area is now in the document repository. You can find it in the RCRA Document Library of the Document Repository in the Main Download section. There are two parts, click here to go to them directly: Part 1 [3] and Part 2. [4]

The air deposition area consists of the residential homes between Main St. and the Niagara/Orleans county line and the canal to Route 31 (Rochester Rd.). The CMS does not include the School property since that has been remediated.
FMC is proposing to use a statistical method to determine exposure and health risks using data from Middleport and Gasport. They have also written the plan to reflect CIG concerns over protecting the village ecosystems and the ecological risk assessment.
Corrective Measures Study Workplan Now Available | Log-in or register a new user account [5] | 0 Comments
Comments are statements made by the person that posted them.
They do not necessarily represent the opinions of the site editor.
Links
  [1] https://middleport-future.com/cig/index.php?name=News&file=article&sid=19
  [2] https://middleport-future.com/cig/index.php?name=News&catid=&topic=2
  [3] https://middleport-future.com/cig/docs/library/Workplans/CMSwp1.pdf
  [4] https://middleport-future.com/cig/docs/library/Workplans/CMSwp2.pdf
  [5] https://middleport-future.com/cig/user.php